Zoom Logo

BSC Meeting - Shared screen with speaker view
Community Engagement
35:39
Buenos dias
Megan Lamont
36:17
Morning all, we'll get started in just a moment
Francisca Schindler
39:12
Good morning, where is the speaker card form located, clickable link or QR code for pubic comment?
Megan Lamont
40:01
You can register for public comment at this link: https://tinyurl.com/aisd2022bond
Francisca Schindler
41:37
Thank You
Francisca Schindler
41:47
Yes
April Clark
43:41
Good morning folks! Is there sound yet? just checking
Community Engagement
44:16
Not yet, they just did a sound check, haven't started yet
Megan Lamont
44:20
We have the room on mute right now while we wait for a few more folks to arrive
April Clark
44:39
Do we have quorum?
Francisca Schindler
45:12
yes
Alexandra Tarpley
45:16
Yes
Nadia Khan - BSC
46:07
i can hear that well
Nadia Khan - BSC
46:11
CANT
April Clark
47:14
feedback
Megan Lamont
47:35
Sorry about that! Is this better?
Monty Exter
47:42
yes
April Clark
47:50
yes
April Clark
51:11
Thank you Kelsey! - can you please list the schools you mentioned in the chat for reference?
Kelsey Campbell
52:20
Andrews, Pecan Springs, Wooldridge Williams, Dobie, Sadler Means, Travis, and Northeast.
April Clark
52:26
THank you
Steven Knapp
55:18
I just wanted to add to my transportation comments that there is currently a $5 Billion EPA program specific to schools to replace diesel buses with electric buses.
Karla Rivera-Figueroa
55:54
Thank you Mr. Knapp
Steven Knapp
56:02
The EPA this year is granting $500 Million in grants to school districts. Let's take our $25 Million in this bond and go for a 100% match!
Barbara Spears-Corbett
56:37
Please Speak up!
Barbara Spears-Corbett
56:55
thank you
Matias Segura
01:04:33
Cuitlahuac- Did you hear the discussion on the increase of bond value? I just saw you come on so wanted to make sure
Cuitlahuac Guerra-Mojarro
01:04:39
no
Cuitlahuac Guerra-Mojarro
01:04:43
which package?
Matias Segura
01:05:05
No Tax Rate Increase: 1.75B;
Matias Segura
01:05:31
1 cent tax rate increase: 2.25 B
Cuitlahuac Guerra-Mojarro
01:06:20
we need to spend time improving the bigger package.
Cuitlahuac Guerra-Mojarro
01:10:12
agreed
Cuitlahuac Guerra-Mojarro
01:10:20
which is why we need to focus on the bigger package
Kelsey Campbell
01:11:18
Those schools don't even know about it
Monty Exter
01:11:42
Thanks for making that point Cuit.
Cuitlahuac Guerra-Mojarro
01:12:07
how is making smaller schools in line with district ed specs. are just making up new school sizes?
Nadia Khan - BSC
01:13:00
SPED community/dept would also like a feedback loop. We’ll benefit from that conversation immensely too.
April Clark
01:14:05
To this note, I propose that we focus today's time on Bond Package B since it has most support almost full by this committee and the majority of trustees
April Clark
01:16:54
Can we all participate in the work session?
Cuitlahuac Guerra-Mojarro
01:17:12
agree with April, focus on the bigger package.
Matias Segura
01:17:20
start with 1.75
Matias Segura
01:17:25
then add from there
April Clark
01:17:37
Start with 2.25 it has the most support
Matias Segura
01:17:41
Board is split on increase vs no increase
Cuitlahuac Guerra-Mojarro
01:17:49
i disagree
April Clark
01:18:06
I have not heard that, I hear more prefer 2.25
Cuitlahuac Guerra-Mojarro
01:18:18
Here are the trustees that support the bigger bond package, from what I heard both Tuesday and Wedensday
Monty Exter
01:18:30
the majority of the board has expressed the desire for the larger package as have we.
Matias Segura
01:18:38
I am offering my guidance and would appriecte support to get this work done.
Cuitlahuac Guerra-Mojarro
01:19:01
*There are more
Yvonne Davis
01:19:58
Increased community engagement will be critical. There is already a great deal of distrust. If the community views that Sadler Means or other schools on the East side are not being treated fairly, this bond package will not be viewed favorably.
Barbara Spears-Corbett
01:19:59
Its my understanding that the Board is split. I agree with Matias we start with the 1.75 and build from that
April Clark
01:20:24
Can we vote on how to proceed?
Matias Segura
01:20:56
Its easier ot add than take away
Cuitlahuac Guerra-Mojarro
01:21:04
It is my understanding that there is more support for the bigger package
Cuitlahuac Guerra-Mojarro
01:21:33
but the bigger package hasn't gotten the scrutiny needed to ensure it is as good as can be
Cuitlahuac Guerra-Mojarro
01:21:38
we spent such little time on it
Matias Segura
01:21:56
but you now have a new small package. And have freed up 225 M
Monty Exter
01:22:41
I agree with April the cmte needs to have a brief discussion about this and vote how we want to proceed.
Matias Segura
01:23:48
sounds good
garret nick
01:24:22
anything beyond proposal A should focus on providing funds for more schools to address major deficiencies in their outdoor recreational spaces in support of the mandate for kids to spend more time in PE classes. many of these spaces are unsafe and unhealthy. and many of these same schools feel very overlooked with this spending so this is an opportunity for more schools to be included for smaller critical improvements aside from the standard vestibule “security” spending.
Lisa Flores
01:27:42
Segregated spaces are not inclusive.
Lisa Flores
01:29:11
Missing is paying a consultant about Universal design
Lisa Flores
01:29:23
No one opposed the cameras present.
April Clark
01:29:47
Do we have a number of how many sped classrooms are in portables and where?
Lisa Flores
01:29:53
This is not representing the conversation.
Lisa Flores
01:30:23
This is making the bond steering committee think there is already an alternative. Their charge is to consider adding to a bond.
Lisa Flores
01:31:01
Bottom line: the bond steering committee gets to choose to install cameras with bond money.
Lisa Flores
01:31:41
There are loopholes used.
Lisa Flores
01:32:01
Parents, admins and trustees can request. Why is the onus on parents?
Barbara Spears-Corbett
01:32:15
I would like to make a point of order
Lisa Flores
01:35:42
My apologies for distracting anyone. Sorry.
April Clark
01:42:32
To clarify 398 eligible that we know of - so how much for cameras?
April Clark
01:42:43
and 8 lifeskill classrooms? in portables?
April Clark
01:43:39
Can we get quick costing to and locations to move those to buildings to include today?
Matias Segura
01:50:50
we have a cost per classroom
Matias Segura
01:51:42
we are getting something
Matias Segura
01:56:21
3K per classroom
April Clark
01:59:10
lets do both but start with b
Cuitlahuac Guerra-Mojarro
01:59:46
i will lower my hand because i agree with Eric and April: start with B.
Valerie Tyler
02:00:13
a computer died
Valerie Tyler
02:00:16
stand by
Megan Lamont
02:00:20
sorry y'all! one moment please
Valerie Tyler
02:00:32
yu cut off barbara- hld on
April Clark
02:00:35
Can we take a vote on where to start?
Valerie Tyler
02:00:36
hold
Valerie Tyler
02:01:05
nadia - we havnt heard ypuo
Valerie Tyler
02:01:10
stop tlking
April Clark
02:02:38
yes - agreed in the public meeting it was expressed not private conversations
Cuitlahuac Guerra-Mojarro
02:02:46
agree with monty and we need to start pricing and working on big package
April Clark
02:04:07
echo
April Clark
02:04:11
yes
Megan Lamont
02:04:32
Sorry about that y'all - thank you for your patience
Monty Exter
02:06:35
The main things I think we need to discuss on savings are phasing travis or not and housing.
April Clark
02:09:28
so we can pull 20 mill from travis
Nadia Khan - BSC
02:11:17
is housing on the board?
Megan Lamont
02:11:34
I can also drop items on the whiteboard in chat
April Clark
02:12:05
Cut Bear Creek +14 millionTrim Travis +20 millionHigher property values +70 million104,000,000Add30,000,000 Martin Partial Mod20,000,000 Navarro CTE20,000,000 Akins CTE10,000,000 SPED cameras/Universal Design/ Inclusion Equipment4,000,000
Megan Lamont
02:12:06
Currently: Bear Creek, Anderson Gym, Hill Phase 2, Phasing for Travis, cost clarity for Nelson Field.
April Clark
02:15:28
Redistribute - cost neutral> Cook 18.5> Houston 32 (crawl space issues- we had previously discussed less here> it feels like a nice to have full mod but 30 was enough in package A)> Odom 18.5 Oak hill 18.5 Williams 17.5 Total 105 mil
Megan Lamont
02:19:57
April, we noted your suggestions on the white board.
April Clark
02:19:58
Anderson was #15 on the LPC list
Nadia Khan - BSC
02:20:25
How many did we pick up before anderson?
Community Engagement
02:20:25
I don't understand your notations, April in your redistribution, what's a put and what's a take
April Clark
02:20:50
Crockett HS and LASA are ahead as far as high schools
Nadia Khan - BSC
02:21:41
I have 2 questions
Nadia Khan - BSC
02:22:29
Barbara’s team didn’t suggest it. It was proposed by the unnamed trustees.
Nadia Khan - BSC
02:24:12
How are these locker room improvements fostering inclusion, adaptive technology etc. ? Are Crockett / LASA being left in a worse situation.
April Clark
02:24:36
I agree Crockett should have priority
April Clark
02:26:47
high school order (there are middle schools as well) Nechs, Navarro, travis, lbj, lasa, crockett, anderson
April Clark
02:32:07
The same could be said about many schools, I agree. Hill is difficult to defend as it didn't come from the process.
Nadia Khan - BSC
02:32:30
What’s the final Hill capacity to be after the phase 2?
April Clark
02:33:48
that is fair if it is a phased question
Valerie Tyler
02:34:47
the night Anderson Gym was added it was added I was traveling and attending remotely. Wasnt’ the suggestion to add anderson and hill from Cuitlahuac, correct?
Barbara Spears-Corbett
02:35:47
Yes....and athletics supported the recommendation
Nadia Khan - BSC
02:36:04
Hill Elementary enrollment is 909, with 822 coming from in zone. And 87 transferring in.
Nadia Khan - BSC
02:37:28
Valerie - Cuit was only the messenger. It wasn’t his suggestions.
Cuitlahuac Guerra-Mojarro
02:37:43
what Nadia said is true.
Valerie Tyler
02:38:52
ok, like I said I was out of state and not present so I could only know what was said on the zoom presentation. Thanks for clarifying.
April Clark
02:41:42
I agree with what Valerie said lets remove it and that amount can be left undefined for trustees but only that amount
Cuitlahuac Guerra-Mojarro
02:42:31
ok understood
Monty Exter
02:42:33
i think we have said no can we move on
Nadia Khan - BSC
02:43:43
I want the Hill final capacity.
April Clark
02:43:49
Because other schools had priority
April Clark
02:46:15
i agree
Cuitlahuac Guerra-Mojarro
02:46:17
agree with what matias is saying
April Clark
02:48:58
Targeted improvements:Redistribute - cost neutral> Cook 18.5> Houston 32 (crawl space issues- we had previously discussed less here> it feels like a nice to have full mod but 30 was enough in package A)> Odom 18.5 Oak hill 18.5 Williams 17.5 Total 105 milFrom:> Current-> Cook 3.8 mil> Houston 60 mil> Oak Hill 5.8 mil> Odom 18.5> Williams 17.5> Total- 105 mil
Community Engagement
02:51:48
@Nadia - Hill is currently at 909, capacity of 920, if phase II were completed, it would be built to the large ES model of 870 (inclusive of the 4th and 5th grade phase I) Their projected 5 year enrollment is 832
Nadia Khan - BSC
02:53:54
thanks!
Nadia Khan - BSC
03:00:30
Are all classrooms without doors addressed by open plan school remolds - ar are there many other classrooms without doors across the district? Asking as this is both a secret concerns and a sped concern.
Nadia Khan - BSC
03:02:29
*security
April Clark
03:02:44
yes
Nadia Khan - BSC
03:04:25
why table are we looking at?
Nadia Khan - BSC
03:05:10
how do i see the slides?
Nadia Khan - BSC
03:05:37
is someone screen sharing?
Cuitlahuac Guerra-Mojarro
03:06:35
i am
Cuitlahuac Guerra-Mojarro
03:07:58
elopers lol
Cuitlahuac Guerra-Mojarro
03:08:11
lets please put cte into the smaller package
Nadia Khan - BSC
03:11:33
partial mods at elementaries in A - andrews, langforg, wooldridge
April Clark
03:17:32
agree on cameras
April Clark
03:18:00
a lot of background sound
April Clark
03:19:53
agree
Nadia Khan - BSC
03:21:18
if no accessible-specific technology is in the technology budget - isn’t that massively against the law? its not an option to provide accommodations for the 13,000 kids receiving spec services.
April Clark
03:23:54
its one million can we move on? we have a lot to get to
Nadia Khan - BSC
03:24:01
could the bucket include, or can we add items specifically for include -central lending library -funds to expand the FCA analysis to include Universal Design, so we have an assessment of all facilities that include that.
April Clark
03:24:44
we have a 500,000 line item for studies, we need to update the language for universal design
Nadia Khan - BSC
03:25:09
@ april, is that 500K included already?
April Clark
03:25:20
unless it was cut?
April Clark
03:25:44
yes it is in both packages it was a facilities strategy
Cuitlahuac Guerra-Mojarro
03:26:22
how much is left for CTE?
Nadia Khan - BSC
03:27:34
ADA and Universal seeing are not the same - so definitely make sure that Universal Design is stressed, please.
April Clark
03:30:16
can we get clarification on what was costed
April Clark
03:32:36
Wasn't fencing in the numbers with an SSR strategy
April Clark
03:33:17
desire for CTE came from Community - asks all year and in feedback from trustees
Nadia Khan - BSC
03:34:44
Also there was community request for general $$ for Navarro
April Clark
03:34:46
Agree with Cuit 100%
April Clark
03:35:44
Add Navarro 8 Akins 8 Crockett 8 and reduce trustee fund to 34
April Clark
03:36:19
I agree we need to allocate
April Clark
03:36:51
Agree
April Clark
03:38:11
how much for VAPA for Crockett?
Cuitlahuac Guerra-Mojarro
03:39:25
how much is hill phase 2?
Megan Lamont
03:40:27
$30,000,000
Valerie Tyler
03:40:30
matias said 30 mil Cuit.
Valerie Tyler
03:40:44
or at least that was what we put in Bond B
Cuitlahuac Guerra-Mojarro
03:40:49
ok thanks
April Clark
03:40:51
crockett wasn't in the top 20 in the vapa stragies
Valerie Tyler
03:40:52
for hill
Cuitlahuac Guerra-Mojarro
03:40:58
does it fit into our expanded package a?
April Clark
03:41:52
What are we saying about CTE? Navarro 9 AKins 9 and what about Crockett
Megan Lamont
03:42:09
Crockett was $4.5M for CTE.
April Clark
03:42:17
is that agreed?
Megan Lamont
03:43:10
I don't think so - Ali brought up that there's been community feedback about needing fine arts investment more than CTE.
Megan Lamont
03:43:41
But we are currently adding it into the table, just to see where we're at.
April Clark
03:43:50
fencing 5 mill , 9 akins 9 Navarro 4.5 crockett cte, and how much is left?
Megan Lamont
03:44:13
We're working to calculate that
Nadia Khan - BSC
03:45:51
Wooten needs a new Mascot too.
Valerie Tyler
03:45:51
about 27.125
Community Engagement
03:46:26
This is what the staff person said from Crockett: Crockett PAC was slated to have a safety renovation of the lighting, rigging, and drapesystems. Thought we would receive improvements last summer, other schools ran long,ran out of money, crucial band-aids applied, everything is not fixed and needs to be fixeddesperately
Nadia Khan - BSC
03:46:37
Are accessible bathrooms already in where they are crutially needed?
Megan Lamont
03:47:39
We have roughly $30M remaining - Hill is not yet included.
Cuitlahuac Guerra-Mojarro
03:49:16
what is delco already getting in package A?
April Clark
03:51:08
Did we just use 10 mil more or was that in the numbers?
Cuitlahuac Guerra-Mojarro
03:51:20
i have a question about this 10 million to delco...
Cuitlahuac Guerra-Mojarro
03:51:33
it includes improvements to the facility that is geared towards CTE?
Cuitlahuac Guerra-Mojarro
03:52:18
or is it to just get the facility improved for the athletics and community events it hosts?
Barbara Spears-Corbett
03:53:14
also structure to allow us to play sports again in a safe environment
Valerie Tyler
03:53:20
@APril - raising delco from 5.8 to 15 million. delta of 9.2 million
Valerie Tyler
03:53:30
but you probably got that now
Cuitlahuac Guerra-Mojarro
03:53:48
my question re: delco is that 10 million does what? improve facilities for sports and activities? or to include CTE?
Nadia Khan - BSC
03:55:06
Do we have a mental heath item in this package? Are accessible bathrooms already in where they are crucially needed?
April Clark
03:56:29
Aggree
Megan Lamont
03:56:33
Currently proposed: $10M for doors and keys; $16M for Crockett VAPA
Barbara Spears-Corbett
03:56:42
yes...included CTE improvements but they left out the building improvements that was apart of the strategy. Can't do one without the other...l
Cuitlahuac Guerra-Mojarro
03:57:15
why though Barbara? can we improve the delco facility without CTE improvements and lower the price?
Valerie Tyler
03:58:35
cuit do I need to bring thisup in the room
April Clark
03:58:41
Agree with Anastasia
Megan Lamont
03:59:20
Taking a 5 minute break to grab food, update spreadsheet, and then start moving into the second package. I'm going to mute the room for a couple minutes and then we'll turn it back on when we return.
April Clark
04:08:39
30 minutes folks...
Monty Exter
04:08:55
we are 10 mins into the 5 min break
Megan Lamont
04:09:23
Matias is still updating the spreadsheet for the second package as our new starting point.
April Clark
04:09:36
Can we start discussing
Megan Lamont
04:10:37
Getting started again
Cuitlahuac Guerra-Mojarro
04:11:55
more for pre K and CTE
Monty Exter
04:11:59
how is redistricting a bond decision?
Cuitlahuac Guerra-Mojarro
04:13:02
not sure monty
Cuitlahuac Guerra-Mojarro
04:13:18
i agree we need to talk about the capacity of the new builds at Pecan & Oak Springs, and Sadler Means
Cuitlahuac Guerra-Mojarro
04:13:41
exactly, we are creating a new category of school sizes in our Ed Specs for both and elementary and middle schools
Cuitlahuac Guerra-Mojarro
04:13:56
what about Sadler Means?
April Clark
04:14:09
I propose adding to Saddler Means Capacity
Nadia Khan - BSC
04:14:13
Do we have a mental heath item in this package? Wondering about calming spaces within classrooms/not segregated spaces. Are accessible bathrooms already in where they are crucially needed?
Monty Exter
04:17:18
is that the current size of those schools?
Nadia Khan - BSC
04:19:19
ALC
Cuitlahuac Guerra-Mojarro
04:19:50
april, co chair of faciliites, has knowledge re: ohenry
April Clark
04:21:29
lets not
Nadia Khan - BSC
04:21:52
All new gyms, music rooms, art room, are/have adaptive technologies, or available from a central lending library. prepped for inclusion. sound baffling large spaces?
Cuitlahuac Guerra-Mojarro
04:21:56
and then monty
April Clark
04:22:48
We didn't ignore FMP, we built upon it and redirected priorities. Its important because there is much confusion in the community
April Clark
04:24:01
can matias please explain what changed
April Clark
04:24:11
1:30 max
Cuitlahuac Guerra-Mojarro
04:24:11
this is why we need second meeting
Cuitlahuac Guerra-Mojarro
04:24:18
30 min max
Cuitlahuac Guerra-Mojarro
04:25:05
exactly
Cuitlahuac Guerra-Mojarro
04:25:13
we need to schedule another meeting for B
Cuitlahuac Guerra-Mojarro
04:25:15
now
April Clark
04:26:26
can we go back to the removal sheet
Cuitlahuac Guerra-Mojarro
04:27:09
im taking a breath
Cuitlahuac Guerra-Mojarro
04:27:13
woosah
Cuitlahuac Guerra-Mojarro
04:28:40
at least some of them, the ones present Wednesday
Cuitlahuac Guerra-Mojarro
04:28:57
we do if we schedule a second meeting
April Clark
04:29:02
how much money do we have left
Megan Lamont
04:29:14
$55.7 million left
Megan Lamont
04:29:58
Raise hand to KEEP Hill in Proposal B
Cuitlahuac Guerra-Mojarro
04:30:35
i want to finish hill. its a phase 2. we don't leave elementary schools unfinished
April Clark
04:33:17
Can we do it with 55 mil?
Megan Lamont
04:33:42
Raise hand for supporting Martin Phase 1 mod
April Clark
04:34:11
I would include it for now
Cuitlahuac Guerra-Mojarro
04:34:11
i support martin phase 1
April Clark
04:34:37
so a net add of 40 mil for martin agreed
Megan Lamont
04:35:06
Adding Martin Phase 1 to the list
April Clark
04:35:55
keep hill because a phased elementary school is not good so we will not have any phased ES
Megan Lamont
04:37:55
Wooten originally had $15.4M allocated; moving it to a full modernization would be $40M. $25M net increase.
Nadia Khan - BSC
04:38:28
Is added money included for changing Wooten’s mascot?
April Clark
04:38:39
Net 25 mill add for wooten to keep the same agreement that we don't do phased Elementary Schools AND PLEASE change mascot
Monty Exter
04:38:41
if we don't do partials it sounds like they should be on the next bond
April Clark
04:42:29
Lets not forget we have IHS moving to NECHS it will need more
Cuitlahuac Guerra-Mojarro
04:43:27
mendez is not getting anything?
Cuitlahuac Guerra-Mojarro
04:45:48
take lbj off the list as not getting money?
Nadia Khan - BSC
04:45:54
no
Cuitlahuac Guerra-Mojarro
04:46:07
ok
Cuitlahuac Guerra-Mojarro
04:46:49
CTE, pre K , mental health spaces?
Megan Lamont
04:46:49
We have $14M remaining. That includes Martin, $25M for Wooten, and Hill.
Cuitlahuac Guerra-Mojarro
04:47:03
we are moving so quickly through this
Cuitlahuac Guerra-Mojarro
04:47:23
we are not sure if some things are included / cut
Cuitlahuac Guerra-Mojarro
04:47:44
deciding on tens/hundreds of millions of dollars in such a short amount of time begs the need for a second meeting.
Megan Lamont
04:48:13
Sorry, I think I misspoke. One moment and then we'll recap.
Monty Exter
04:50:01
yes
April Clark
04:50:14
Agreed as far as community feedback, we did open plans, fencing, cte, sped
Cuitlahuac Guerra-Mojarro
04:50:18
sped, cte, pre k
Cuitlahuac Guerra-Mojarro
04:50:29
students centered investments
April Clark
04:50:33
Could use more for CTE and Sped
April Clark
04:52:15
We can take open plans off
Monty Exter
04:54:01
is Anderson currently in or out of the total in the spreadsheet?
Cuitlahuac Guerra-Mojarro
04:54:11
Anderson gym and lockers came in as a suggestion to make the bond favorable for the d4 trustee
Valerie Tyler
04:54:13
currently in
Monty Exter
04:54:18
thx
Valerie Tyler
04:54:19
the discussion wuld be to take out
Valerie Tyler
04:54:32
we left anderson / crockett in for discussion now
April Clark
04:54:32
Crockett should get prioritized
April Clark
04:56:50
Agreed to follow the process, which prioritized Crockett
April Clark
04:59:16
Can i get a response
Cuitlahuac Guerra-Mojarro
04:59:48
yes sped
Cuitlahuac Guerra-Mojarro
04:59:50
our first priority
Cuitlahuac Guerra-Mojarro
04:59:52
!!!
Cuitlahuac Guerra-Mojarro
04:59:55
thank you valerie
April Clark
05:00:01
True - point
April Clark
05:00:10
I agree with that
April Clark
05:00:22
We would remove the gym is what she is proposing
Cuitlahuac Guerra-Mojarro
05:00:42
is housing in package B?
Monty Exter
05:00:57
already been taken out
Megan Lamont
05:01:00
No, housing was removed
Cuitlahuac Guerra-Mojarro
05:01:02
ok thanks
Barbara Spears-Corbett
05:01:14
that's not acceptable because we are talking safety for all students at these sites
Cuitlahuac Guerra-Mojarro
05:04:01
im not comfortable with a vote on package b right now
April Clark
05:07:05
5-10 million for sped safety issues
April Clark
05:08:57
Is there anything still on the white board people feel strong about?
April Clark
05:10:41
Do we have quorum?
Cuitlahuac Guerra-Mojarro
05:10:47
the idea that we don't have time is very frustrating
Cuitlahuac Guerra-Mojarro
05:10:52
we do we just don't want to take it
Nadia Khan - BSC
05:11:07
Are ADA accessibility deficiencies in egress pathways covered in critical deficiencies?
April Clark
05:13:25
Can you please confirm when / how we are meeting again?
Cuitlahuac Guerra-Mojarro
05:13:40
to be clear, there is no political strategy fund for trustees
Lisa H
05:14:05
thanks, everybody!
Cuitlahuac Guerra-Mojarro
05:14:21
we need to be working alongside the board
Cuitlahuac Guerra-Mojarro
05:14:45
the work session thrusday needs to be like the one in june with the long range planning committee
Megan Lamont
05:16:58
Meeting adjourned, thanks all!